Skip to main content
Advanced Solutions Group
1997 — Part 1 withdrawn; Part 2 available superseded

AS/NZS 4488

Industrial Rope Access Systems — Historical References

Historical AS/NZS 4488 rope-access references and current AS/NZS ISO 22846:2020 parts. Document status alone does not determine existing equipment suitability.

This guide is general orientation, not the licensed standard, legal advice or permission to work. Verify current sources, manufacturer instructions and site conditions with a competent person. Linked tools are preliminary aids, not design or compliance approval.

Orientation only. This summary is not the licensed standard or current legal advice. Confirm the exact edition, parts and applicability, obtain competent project-specific review, and follow verified manufacturer instructions. Unverified numerical specifications, penalties and universal inspection rules are not prescribed here.

Historical parts and current adopted references

The publisher lists AS/NZS 4488.1:1997, Part 1: Specifications, as withdrawn, and AS/NZS 4488.2:1997, Part 2: Selection, use and maintenance, as available superseded. These historical industrial rope-access references concern materials, hardware and selection, use and maintenance; they are not a generic suspended-access equipment standard.

The current adopted references are AS/NZS ISO 22846.1:2020 (fundamental principles) and AS/NZS ISO 22846.2:2020 (code of practice). Part 2 adopts ISO 22846-2:2012. “Code of practice” here is a standards publication title, not automatic NSW approval as a WHS code. Use the linked publisher records to identify the documents and obtain the applicable licensed text.

Withdrawal or supersession alone does not invalidate existing equipment or establish a universal replacement duty. Suitability and any required action depend on the equipment, manufacturer instructions, records, work method, applicable obligations and competent project-specific review.

Scope and access method

Rope access planning considers the task, building geometry, anchors, rope routes, edges, dropped objects and rescue access. It is not suitable for every location, and a website guide does not establish an approved work method.

Rope systems and rigging

Working and backup arrangements, independence, protection and transitions need competent task-specific planning. Do not interpret this summary as permission for a single-rope method or as a universal rigging instruction. Anchor selection and load cases require verified evidence.

Personnel and equipment evidence

Confirm the current task-specific qualifications, experience, supervision and manufacturer requirements. Personnel certification is distinct from project or system compliance. Inspect equipment using its instructions and applicable schedule; no universal inspection interval is given here.

Operational preparation

Agree method and risk assessments, rigging and rescue plans, communications, weather limits and exclusion zones before work. Share product and anchor records, plans, site restrictions and emergency access. Preliminary geometry tools do not replace competent design or rigging review.