Roof works have changed: prepare a height safety reassessment enquiry

Roof plant, roof works or maintenance tasks have changed since the last assessment? Prepare a clear change summary and scope questions for a height safety reassessment enquiry.

ASG mechanical equipment photographed on a Sydney roof; reassessment enquiry context only, not evidence of changed works, a test result or certification.

Planning a height safety reassessment after new rooftop plant, roof repairs or a different maintenance task? Start by explaining what has changed since the previous assessment, using records you already hold. For Sydney property and facilities teams, this is an enquiry brief for an assessor—not a decision about whether an existing arrangement is suitable.

Describe the change, not just the equipment

Instead of sending an old report with a request to ‘check the anchors’, explain the difference between the recorded arrangement and the work now proposed. Has an air-conditioning unit moved? Have roof works altered an area shown on the old plan? Does a contractor now need to reach a different service point? Treat these as questions to describe in the enquiry, not instructions to inspect the roof yourself.

Prepare a short change summary from project correspondence, drawings, maintenance requests and reports already available to you. Separate completed changes from planned works. If the records disagree, identify the disagreement rather than selecting whichever drawing looks newest.

For each change, include:

  • Before: The task, location or arrangement described in the previous assessment, with its report reference or drawing revision.
  • Changed or proposed: What the available records say has changed, or what the new work request proposes.
  • Affected task or route: The destination and proposed route described in those records; mark any unconfirmed route clearly.
  • Evidence held: The relevant document name, revision or correspondence, so the assessor can find the information.
  • Unknown: Anything you cannot establish from the records, including whether the change is complete.

Do not enter the roof or operate equipment to fill gaps in this brief. Use existing information and ask how any further site information would be obtained within an agreed assessment scope.

Compare the new task with the recorded scope

Read the scope and limitations in the previous report alongside the new work request. What task was described then? Which area is being discussed now? Is the proposed route shown in the material you hold, or is it only a contractor’s suggestion? Put those questions in the enquiry without deciding whether the route can be used.

Safe Work Australia’s Working at heights guidance places work on the ground or a solid construction first where possible 1. Ask the assessor whether the changed maintenance task can be approached without roof access; do not start the enquiry by prescribing an anchor-based solution.

The same national Working at heights guidance addresses safe ways to enter and exit a workplace, including areas with a risk of a fall 1. Ask whether the proposed assessment will consider the changed route as well as the destination, and identify any access concern already recorded in the documents you hold.

Keep uncertainties visible

Use ‘not confirmed’ where that is the honest answer. You might have a plant replacement instruction but no completion record, or a marked-up layout with no corresponding revision in the assessment file. Describe that gap and attach the relevant records. Do not turn a planned layout into a statement about what is installed.

Keep your annotations on a copy of the drawing. Label them as enquiry notes and distinguish document information from your questions. If an existing report records a restriction or an unresolved item, include its exact wording and reference rather than paraphrasing it as resolved.

Ask the assessor which uncertainties can be addressed through a records review and which need a separately scoped site visit or specialist input. This brief does not determine certificate validity or set a retesting interval.

Agree the scope and engineering responsibility

Ask for a quotation that identifies the changed task or area being considered, the available baseline records and the questions to be answered. Which parts of the previous assessment will be reviewed, and which parts will remain outside the new scope? How will the provider record any unanswered questions?

Discuss responsibility explicitly:

  • Will the proposed review consider the changed task and access arrangement, or only the nominated equipment?
  • If questions about supporting structure or design arise, who will commission and provide the engineering input?
  • What supporting documents would that person need, and who will supply them?
  • What written findings and limitations will be delivered, and who will coordinate any further work identified?

These are matters to agree with the provider, not engineering conclusions for a building manager to make from drawings or photographs. Ask the provider to explain the basis and scope of any inspection or testing they propose rather than specifying a test yourself.

Send a focused enquiry to ASG

Send the property address, your change summary, the previous assessment reference and the new maintenance request. Attach the relevant records you hold and list what is missing. Ask ASG to discuss a review scope for the changed task, including how unresolved design or structural questions would be handled.

Read about ASG height safety services, or send a reassessment enquiry with your available records. An enquiry starts a scope discussion; it is not authorisation for roof access.

Source and scope

This article is general enquiry preparation, not a site assessment, engineering design, equipment-use instruction or certification. It does not prescribe anchors, tests or access methods, and it makes no conclusion about an existing certificate.

Safe Work Australia’s Codes of Practice page says a model code needs jurisdictional approval to have legal effect 2. No automatic NSW adoption is asserted here. Ask the provider which current local requirements and source documents apply to the proposed scope. The two undated HTML pages below are identified by their visible titles, not an inferred publication date.