Agree your rope-access scope
Before comparing quotes, agree the task, access suitability, responsibilities and records. Personnel competence, supervision and rescue arrangements remain project-specific.
What findings and records do we need?
Agree the areas to inspect, the findings report and completion records required, who prepares and retains them, and how exclusions or areas not inspected will be recorded. Confirm the reporting scope rather than assuming an access inspection includes a structural engineering assessment.
Who owns repair/trade or structural engineering scope?
Agree who provides the underlying repair or trade work and any structural engineering review, including task-specific skills and approvals. Rope access is the access method; it does not itself establish a repair design or structural suitability.
Can an existing anchor be used for the proposed rope-access work?
An inspection tag is not proof of suitability for the proposed rope-access work. Seek competent review of the intended use, exact product and manufacturer information, substrate and fixing records, and access and rescue arrangements. Use the anchor-selection guide and discuss the required scope of anchor inspection and testing; neither a tag nor this page approves the proposed use.
If the task also involves a confined space, discuss combined rope access and confined-space support where suitable for the assessed work. Rope access does not replace the confined-space assessment, permit, outside standby or rescue arrangements, or make every location suitable for entry.
Plan your rope-access work